Our Ethanol Plant
The project consist of of the implmentation of a 100,000LPD of High-Quality Ethanol products up to 99.9% purity. Due to the poor quality of the Nigeria's power sector, marked by significant challenges such as a massive electricity access deficit, frequent power outages, and unreliable grid supply, even for those who are connected, the Project shall be designed and provided with its own integrated Power Plant of 7-14 power units of 1MW each to boost its reliability, maintainability, efficiency and maximum output. The Project shall also be provided with its own Water Treatment Plant of Total Annual Production of 115,466,554 Gallons (or 437,088.50 m3) of fresh water due to the unrealisable and poor water infrastructure and supply in Nigeria.